Iwcf and IADC Full Size Drilling and Well Control Simulator

Product Details
Customization: Available
Warranty: 3 Year
Condition: New
Gold Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 14000, GMP, QSR
OEM/ODM Availability
Yes
  • Iwcf and IADC Full Size Drilling and Well Control Simulator
  • Iwcf and IADC Full Size Drilling and Well Control Simulator
  • Iwcf and IADC Full Size Drilling and Well Control Simulator
  • Iwcf and IADC Full Size Drilling and Well Control Simulator
  • Iwcf and IADC Full Size Drilling and Well Control Simulator
  • Iwcf and IADC Full Size Drilling and Well Control Simulator
Find Similar Products

Basic Info.

Model NO.
LS-DWC-01
Customized
Customized
Certification
ISO9001, CE, CCC
Working Voltage
220V 50Hz AC
Working Temperature
0 ºC -40 ºC
Display Resolution
1920 * 1080, 3840 * 2160
Mean Time Between Failures of The System
≥ 5000 Hours
Floor Area
≥ 40 Square Meters
Trademark
LS
Origin
China

Product Description

a)Drillerconsole
Driller console has three models as below. The controls and display are the same as real driller
console. It can simulate draw-works raising and lowering, mud pump speed regulating, etc. and
display parameters at real time, such as WOB, top drive rotary rate, standpipe pressure, casing
pressure,torque,inflowrate,outflowpercentage,welldepth,bitposition,topdriveheight,footage,
drillingtime,drillingtime,drillpipe speed,bottomholepressure,formation pressure,etc.
Iwcf and IADC Full Size Drilling and Well Control SimulatorIwcf and IADC Full Size Drilling and Well Control SimulatorIwcf and IADC Full Size Drilling and Well Control SimulatorIwcf and IADC Full Size Drilling and Well Control SimulatorIwcf and IADC Full Size Drilling and Well Control Simulator2-2: Software
2-2-1- Training function for Drilling rig operatingRotary table ,Draw work operation ,Mud pump ,Top driveoperation, Training for pulling and down for drilling pipes,Training on connecting and opening drilling pipes,Preparation operations to start operating the drilling rig,Reading and setting drilling process indicators (pressures,drilling weight, pump speed, mud density , etc. )
2-2-2- Includes training and solving all downholeproblems
(stuck pipe, mud loss, bit problem, key seat, deferential stuck, caving, drilling string washout, well kick, etc.)
2-2-3- Well control operations
Includes training for ( shut-in training ,Well killing training,Shut-in and the well is empty, Blowout prevention equipmentfunctions, Preparing the kill sheet, Prepare the killing mud,Driller's Well Killing Operation, Waiting and Weighting WellKilling Operation, etc.)
2-2-4-Includes tests and exams with the result of the student (trainee).
2-2-5-This system can provide a variety of training items forthe trainer, and has a complete function of guiding the trainerto operate. When the trainer has wrong operation, the systemwill alarm and prompt, so as to help the trainer quickly graspthe operation essentials and improve the learning efficiency.
2-2-6-The simulator features a 100% real rig PLC controlsystem simulation software architecture that fully simulatesthe mode and function of the real rig.
2-2-7-Virtual reality technology is used to recreate the visualenvironment of the site, showing the well site and equipmentmovements.. At the same time in the virtual scene has the realrig instrument data curve and real-time data.
2-2-8-With realistic sound effects, the system configuresvarious sound effects on the scene. The sound effect isconsistent with the students' operation, working condition andgraphic display.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier