Customization: | Available |
---|---|
Warranty: | 3 Year |
Condition: | New |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Power | 220V/50HZ/400W |
SIZE | 1.76MX1.1MX1.4M |
Weight | 200KG |
Modules/training | The simulator offer over 20 training modules.For RTG training simulator operation, the simulator include novice guidance,fixed point parking,run around the rod, crossing frame,control signal, shoot down the block,goods transfer ,container stacking ,crossing frame score, rod winding performance,shot down wood test, container stacking test,fixed point parking test, and pole running test , etc |
Main body Materials | steel |
Main components | -* * Hardware System * *: -* * Operation console * *: Simulate the operation handle, buttons, dashboard, display screen, etc. of a real crane. -Visual System: Multi screen display or VR headset, providing a 3D perspective to simulate actual work scenarios (such as ports, yards, railway freight yards, etc.). -* * Sound System * *: Restoring the motor sound, alarm sound, environmental sound effects, etc. during the operation of the crane. -* * Software System * *: -Virtual Scene Engine: Simulate different weather conditions (rain, fog, strong winds), lighting conditions (day/night), and complex working conditions (obstacles, narrow spaces). -* * Physics Engine * *: Accurately simulates the mechanical characteristics of a crane, such as weight swing, inertia, and track friction. -* * Training module * *: includes courses such as basic operations, fault handling, emergency drills, etc. -* * Evaluation System * *: Record operational data (such as collision frequency, lifting accuracy, time efficiency) and generate scoring reports. |
Core functions | -Basic Operation Training: Start/Stop, Hook Lifting, Big/Small Vehicle Movement, Load Control. -Complex working condition drill: precise lifting (container stacking, steel handling), obstacle avoidance operation, and multi machine collaborative operation. -Fault simulation: sudden power outage, mechanical failure (such as wire rope breakage), environmental risk (strong wind warning). -* * Safety regulations learning * *: Overload protection, limit alarm, emergency braking operation. |
Application scenarios | -* * Vocational training school * *: provides standardized operation certification training for students. -Port/logistics enterprises: Improve the skills of on-the-job operators and reduce actual operational accidents. -* * Safety assessment agency * *: used for operational qualification certification exams. |
Basic operation process | 1. * * Start the crane * *: -Turn on the power switch and complete the self-test program. -Press the 'Start' button and wait for the system initialization to complete. 2. Hook control: -Lifting/Lowering: Push the left handle forward/backward to control the vertical movement of the hook. -* * Fine tuning operation * *: Gently push the handle to achieve precise positioning (such as aligning with the container lock hole). 3. * * Large/small vehicle movement * *: -* * Large vehicle (track walking) * *: Push the right handle left and right to control the crane to move longitudinally along the track. -* * Small car (crossbeam movement) * *: Push the right handle forward and backward to control the horizontal movement of the lifting device on the crossbeam. 4. * * Lifting Operation * *: -Observe the load weight on the display screen to ensure it is not overloaded. -Adjust the position of the lifting equipment through multi perspective monitoring (overhead/side view) and slowly lift it. -Transport the load to the target location and place it steadily in combination with the movement of the large/small vehicle. **3. Advanced operational skills** -* * Anti sway control * *: Reduce the swinging of the lifting weight through a "jog" operation (brief start stop). -Multi machine collaboration: Collaborate with other cranes in simulated scenarios to avoid collisions. -* * Emergency Response * *: -In case of sudden malfunction, immediately press the red emergency stop button. -When simulating strong wind weather, it is necessary to lower the load height and move slowly. **4. End training** -Raise the hook to a safe height and return the cart/trolley to its initial position. -Turn off the power and exit the system. -View the evaluation report and analyze the operational error points (such as speeding and collisions). |
Precautions | 1. * * Safety Regulations * *: -It is strictly prohibited to quickly switch the operating direction during the lifting process. -When overloaded, the system will automatically lock and needs to be uninstalled before resetting. 2. * * Environmental Perception * *: -Pay attention to dynamic obstacles in virtual scenes, such as moving vehicles and people. -Night work requires turning on the lighting. 3. * * Maintenance * *: -Regularly calibrate the sensitivity of the handle and clean the operating table. -Update software versions to obtain new scenarios and features. |
Advantages and Value | -Zero risk training: To avoid accidents or equipment damage caused by operational errors in real homework. -* * Cost savings * *: Reduce fuel, equipment wear and tear, and site occupancy costs. -Efficient Training: Quickly improve skills through repeated practice and instant feedback. |